United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· SPPOnshore wind project GEN-2007-042, Hansford County
Onshore wind project GEN-2007-042, Hansford County is a 360 MW onshore wind request withdrawn in the SPP interconnection queue, in Hansford County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2007 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2007-042
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Location
- Hansford County, Texas
- Technology
- Wind: 360 MW
- Total requested
- 360 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 28 September 2007
- Proposed online date
- September 2010
Location
Marker shows the centre of Hansford County; the queue data does not give exact sites.
Other requests in Hansford County
- Battery storage project GEN-2023-SR8, Hansford CountyBattery storage Β· 200 MW Β· agreement signed
- Solar project GEN-2024-046, Hansford CountySolar Β· 345 MW Β· in study
- Solar project GEN-2024-045, Hansford CountySolar Β· 345 MW Β· in study
- Battery storage project GEN-2026-PR4, Hansford CountyBattery storage Β· 132 MW Β· in study
- Onshore wind project GEN-2025-SR2, Hansford CountyOnshore wind Β· 67.2 MW Β· in study
- Onshore wind project GEN-2006-044, Hansford CountyOnshore wind Β· 370 MW Β· built
- Onshore wind project GEN-2010-014, Hansford CountyOnshore wind Β· 359 MW Β· built
- Onshore wind project GEN-2011-022, Hansford CountyOnshore wind Β· 299 MW Β· built
- Onshore wind project GEN-2002-008, Hansford CountyOnshore wind Β· 240 MW Β· built
- Onshore wind project GEN-2002-009, Hansford CountyOnshore wind Β· 67.2 MW Β· built
- Onshore wind project GEN-2006-020S, Hansford CountyOnshore wind Β· 20.0 MW Β· built
- Other project GEN-2022-112, Hansford CountyOther Β· 370 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem