United States βΊ Grid βΊ Interconnection queues βΊ New York
BATTERY STORAGE Β· NYISOOrchard BESS
Orchard BESS is a 100 MW battery storage request withdrawn in the NYISO interconnection queue, in Ulster County, New York, connecting to CHGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-059
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CHGE
- Developer
- Empire Reserve Energy, LLC
- Connection point (POI)
- 115kV Modena Substation
- Location
- Ulster County, New York
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Queue status
- Withdrawn
- Entered queue
- 1 August 2024
Location
Marker shows the centre of Ulster County; the queue data does not give exact sites.
Other requests in Ulster County
- Alcazar 2Battery storage Β· 150 MW Β· in study
- Lincoln Park DG, LLCBattery storage Β· 150 MW Β· in study
- Marlboro StorageBattery storage Β· 100 MW Β· in study
- Alcazar 1Battery storage Β· 100 MW Β· in study
- Kce NY 34Battery storage Β· 100 MW Β· in study
- Kce NY 5Battery storage Β· 94.0 MW Β· in study
- Magruder BESSBattery storage Β· 20.0 MW Β· in study
- Alcazar Energy StorageBattery storage Β· 250 MW Β· withdrawn
- NY New Paltz 540 State Rte 32 S StorageBattery storage Β· 221 MW Β· withdrawn
- Lincoln ParkBattery storage Β· 150 MW Β· withdrawn
- Pine Hill Energy StorageBattery storage Β· 120 MW Β· withdrawn
- Highland StorageBattery storage Β· 115 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem