United States βΊ Grid βΊ Interconnection queues βΊ Maryland
GAS Β· PJMGas project B29, Harford County
Gas project B29, Harford County is a 750 MW gas request withdrawn in the PJM interconnection queue, in Harford County, Maryland, connecting to BGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 1999 (completed)
- Withdrawn / abandonedApr 2001 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- B29
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- BGE
- Connection point (POI)
- Perryman 230kV/115kV
- Location
- Harford County, Maryland
- Technology
- Gas: 750 MW
- Total requested
- 750 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 15 November 1999
- Withdrawn
- April 2001
Location
Marker shows the centre of Harford County; the queue data does not give exact sites.
Other requests in Harford County
- Battery storage project AH1-725, Harford CountyBattery storage Β· 500 MW Β· in study
- Perryman 6 Units 1-4Gas Β· 130 MW Β· built
- ConowingoHydro Β· 36.0 MW Β· built
- Conowingo Hydro StationHydro Β· 24.0 MW Β· built
- Fairview Farms ISolar Β· 15.0 MW Β· built
- Fairview Farms IISolar Β· 15.0 MW Β· built
- Perryman 51Coal Β· 10.0 MW Β· built
- Perryman Generating Unit 51Gas Β· 10.0 MW Β· built
- Kingsville SolarSolar Β· 1.1 MW Β· built
- Gas project A47, Harford CountyGas Β· 740 MW Β· withdrawn
- Gas project C12, Harford CountyGas Β· 550 MW Β· withdrawn
- Gas project C13, Harford CountyGas Β· 550 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem