United States βΊ Grid βΊ Interconnection queues βΊ Ohio
ONSHORE WIND Β· PJMOnshore wind project W3-059C_AT8, Fulton County
Onshore wind project W3-059C_AT8, Fulton County is a 99.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Fulton County, Ohio, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2010 (completed)
- Withdrawn / abandonedJun 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W3-059C_AT8
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Allen Junction 138kV
- Location
- Fulton County, Ohio
- Technology
- Wind: 99.0 MW
- Total requested
- 99.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 10 September 2010
- Proposed online date
- December 2010
- Withdrawn
- June 2011
Location
Marker shows the centre of Fulton County; the queue data does not give exact sites.
Other requests in Fulton County
- CG Fulton CountySolar Β· 199 MW Β· agreement signed
- Solar project AH2-155, Fulton CountySolar Β· 95.0 MW Β· in study
- Solar project AH2-165, Fulton CountySolar Β· 80.0 MW Β· in study
- Solar project AH2-166, Fulton CountySolar Β· 45.0 MW Β· in study
- Arche Energy ProjectSolar Β· 67.0 MW Β· built
- Arche Energy ProjectSolar Β· 40.0 MW Β· built
- Solar project AG2-053, Fulton CountySolar Β· 300 MW Β· withdrawn
- Solar project AG1-408, Fulton CountySolar Β· 300 MW Β· withdrawn
- Battery storage project AG2-054, Fulton CountyBattery storage Β· 100 MW Β· withdrawn
- Onshore wind project J166, Fulton CountyOnshore wind Β· 99.0 MW Β· withdrawn
- Onshore wind project J165, Fulton CountyOnshore wind Β· 97.6 MW Β· withdrawn
- Onshore wind project W3-059B_AT7, Fulton CountyOnshore wind Β· 97.6 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem