United States β€Ί Grid β€Ί Interconnection queues β€Ί New Jersey

BATTERY STORAGE Β· PJM

Battery storage project AF1-126, Burlington County

Battery storage project AF1-126, Burlington County is a 250 MW battery storage request withdrawn in the PJM interconnection queue, in Burlington County, New Jersey, connecting to JCPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2019 (completed)
  2. Withdrawn / abandonedOct 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AF1-126
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
JCPL
Connection point (POI)
Cookstown 230 kV
Location
Burlington County, New Jersey
Technology
Battery: 250 MW
Total requested
250 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
17 September 2019
Proposed online date
October 2022
Withdrawn
October 2020

Location

Marker shows the centre of Burlington County; the queue data does not give exact sites.

Power plants in New Jersey Β· Transmission lines in New Jersey

Other requests in Burlington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem