United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
SOLAR Β· MISOSolar project J3531, White County
Solar project J3531, White County is a 100 MW solar request withdrawn in the MISO interconnection queue, in White County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3531
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- Other_
- Location
- White County, Arkansas
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 17 April 2024
- Proposed online date
- June 2027
- Withdrawn
- September 2025
Location
Marker shows the centre of White County; the queue data does not give exact sites.
Other requests in White County
- Solar + storage project J2133, White CountySolar + storage Β· 100 MW Β· in study
- Solar project J2742, White CountySolar Β· 100 MW Β· in study
- Solar project J893, White CountySolar Β· 100 MW Β· built
- Solar project J1373, White CountySolar Β· 95.0 MW Β· built
- Solar + storage project J2854, White CountySolar + storage Β· 150 MW Β· withdrawn
- Solar project J1134, White CountySolar Β· 100 MW Β· withdrawn
- Solar project J653, White CountySolar Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem