United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOSpeckhardt Energy Storage
Speckhardt Energy Storage is a 100 MW battery storage request withdrawn in the NYISO interconnection queue, in Rensselaer County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1488
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- ACE DevCo NC, LLC
- Connection point (POI)
- Greenbush 115 kV Substation
- Location
- Rensselaer County, New York
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Queue status
- Withdrawn
- Entered queue
- 22 December 2022
Location
Marker shows the centre of Rensselaer County; the queue data does not give exact sites.
Other requests in Rensselaer County
- Willard Storage (NYISO-C24-148)Battery storage · 300 MW · in study
- Willard StorageBattery storage · 300 MW · in study
- SolarSolar · 20.0 MW · in study
- Hilltop SolarSolar · 20.0 MW · in study
- CS Hawthorn SolarSolar · 20.0 MW · in study
- Empire GeneratingGas · 635 MW · built
- Empire GeneratingGas · 635 MW · built
- StephentownBattery storage · 20.0 MW · built
- StephentownBattery storage · 20.0 MW · built
- Knickerbocker Energy StorageBattery storage · 300 MW · withdrawn
- Topaz Storage ProjectBattery storage · 200 MW · withdrawn
- Honey Bee Battery Storage, LLCBattery storage · 199 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem