Butterfly Meadows is a 100 MW battery storage request in interconnection study in the PJM interconnection queue, in Van Wert County, Ohio, connecting to AEP.

Queue statusIn planning
  1. PlanningQueued Sep 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2024 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AG1-411
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Developer
Butterfly Meadows Solar Project, LLC
Connection point (POI)
Maddox Creek-RP Mone 345 kV
Location
Van Wert County, Ohio
Technology
Battery: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study
Queue status
Active
Entered queue
30 September 2020
Proposed online date
September 2024

Location

Marker shows the centre of Van Wert County; the queue data does not give exact sites.