United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
OTHER Β· PJMOther project W4-069, Lycoming County
Other project W4-069, Lycoming County is a 3.0 MW other request withdrawn in the PJM interconnection queue, in Lycoming County, Pennsylvania, connecting to PPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2011 (completed)
- Withdrawn / abandonedApr 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W4-069
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Lycoming
- Location
- Lycoming County, Pennsylvania
- Technology
- Other: 3.0 MW
- Total requested
- 3.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 31 January 2011
- Proposed online date
- April 2012
- Withdrawn
- April 2011
Location
Marker shows the centre of Lycoming County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Lycoming County
- Solar project AI2-195, Lycoming CountySolar Β· 69.9 MW Β· in study
- Solar project AI2-196, Lycoming CountySolar Β· 51.5 MW Β· in study
- Solar + storage project AI2-434, Lycoming CountySolar + storage Β· 20.0 MW Β· in study
- Solar + storage project AI1-129, Lycoming CountySolar + storage Β· 4.5 MW Β· in study
- Patriot Generating StationGas Β· 850 MW Β· built
- Laurel HillOnshore wind Β· 70.0 MW Β· built
- Patriot Generating StationGas Β· 57.0 MW Β· built
- Solar project AF1-216, Lycoming CountySolar Β· 143 MW Β· withdrawn
- Solar + storage project AG2-417, Lycoming CountySolar + storage Β· 100 MW Β· withdrawn
- Solar project AF2-145, Lycoming CountySolar Β· 51.0 MW Β· withdrawn
- Solar project AG2-398, Lycoming CountySolar Β· 10.0 MW Β· withdrawn
- Gas project G49, Lycoming CountyGas Β· 10.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem