🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Illinois

SOLAR · MISO

Surplus; J291

Surplus; J291 is a 169 MW solar request in interconnection study in the MISO interconnection queue, in Scott County, Illinois, connecting to AMEREN ILLINOIS.

Queue statusIn planning
  1. PlanningQueued Aug 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1114
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN ILLINOIS
Connection point (POI)
Alsey Generation Station
Location
Scott County, Illinois
Technology
Solar: 169 MW
Total requested
169 MW
Queue status
Active
Entered queue
19 August 2025
Proposed online date
September 2028

Location

Marker shows the centre of Scott County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Scott County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem