United States βΊ Grid βΊ Interconnection queues βΊ Illinois
SOLAR Β· MISOSolar project J1012, Scott County
Solar project J1012, Scott County is a 100 MW solar request withdrawn in the MISO interconnection queue, in Scott County, Illinois, connecting to PRAIRIE POWER, INC..
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedMar 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1012
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- PRAIRIE POWER, INC.
- Connection point (POI)
- Jacksonville Ind. Park - Winchester 138kV Line Tap
- Location
- Scott County, Illinois
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 12 March 2018
- Proposed online date
- September 2021
- Withdrawn
- March 2019
Location
Marker shows the centre of Scott County; the queue data does not give exact sites.
Other requests in Scott County
- Solar project J4000, Scott CountySolar Β· 343 MW Β· in study
- Solar project J4031, Scott CountySolar Β· 245 MW Β· in study
- Solar project J3949, Scott CountySolar Β· 245 MW Β· in study
- Surplus; J291Solar Β· 169 MW Β· in study
- Gas project J291, Scott CountyGas Β· 45.0 MW Β· built
- Solar project J2703, Scott CountySolar Β· 398 MW Β· withdrawn
- Solar project J3174, Scott CountySolar Β· 180 MW Β· withdrawn
- Solar project J3683, Scott CountySolar Β· 100 MW Β· withdrawn
- Solar project J3396, Scott CountySolar Β· 30.0 MW Β· withdrawn
- Solar project J3392, Scott CountySolar Β· 25.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem