United States βΊ Grid βΊ Interconnection queues βΊ Illinois
ONSHORE WIND Β· PJMOnshore wind project O30, Jo Daviess County
Onshore wind project O30, Jo Daviess County is a 9.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Jo Daviess County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2005 (completed)
- Withdrawn / abandonedJul 2005 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- O30
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Nora
- Location
- Jo Daviess County, Illinois
- Technology
- Wind: 9.0 MW
- Total requested
- 9.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 16 May 2005
- Proposed online date
- October 2006
- Withdrawn
- July 2005
Location
Marker shows the centre of Jo Daviess County; the queue data does not give exact sites.
Other requests in Jo Daviess County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem