SOLAR Β· MISOSolar project J3561, Jo Daviess County
Solar project J3561, Jo Daviess County is a 135 MW solar request withdrawn in the MISO interconnection queue, in Jo Daviess County, Illinois, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3561
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Galena (DPC) - Savanna 161kV
- Location
- Jo Daviess County, Illinois
- Technology
- Solar: 135 MW
- Total requested
- 135 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 18 April 2024
- Proposed online date
- January 2028
- Withdrawn
- December 2025
Location
Marker shows the centre of Jo Daviess County; the queue data does not give exact sites.