United States › Grid › Interconnection queues › Pennsylvania
SOLAR + STORAGE · PJMTolna Energy Center
Tolna Energy Center is a 20.0 MW solar + storage request withdrawn in the PJM interconnection queue, in York County, Pennsylvania, connecting to ME.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2020 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-383
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ME
- Connection point (POI)
- Tolna 115 kV
- Location
- York County, Pennsylvania
- Technology
- Solar: 20.0 MW · Battery
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 31 March 2020
- Proposed online date
- January 2028
- Withdrawn
- September 2025
Location
Marker shows the centre of York County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in York County
- Peach Bottom Units #2 & #3Nuclear · 44.0 MW · agreement signed
- Battery storage project AH2-335, York CountyBattery storage · 130 MW · in study
- Strinestown Solar ProjectSolar · 79.6 MW · suspended
- Dover SolarSolar · 55.0 MW · suspended
- Dover SolarSolar · 20.0 MW · suspended
- Delta YorkGas · 760 MW · built
- DeltaGas · 550 MW · built
- Peach Bottom Units 2 & 3Nuclear · 206 MW · built
- Muddy RunHydro · 160 MW · built
- Peach Bottom - Units 2 & 3Nuclear · 140 MW · built
- Delta YorkGas · 120 MW · built
- Peach Bottom 2 & 3Nuclear · 70.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem