SOLAR Β· SPPSolar project GEN-2015-040, Yoakum County
Solar project GEN-2015-040, Yoakum County is a 50.1 MW solar request withdrawn in the SPP interconnection queue, in Yoakum County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2015 (completed)
- Withdrawn / abandonedJul 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2015-040
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Mustang 230kV
- Location
- Yoakum County, Texas
- Technology
- Solar: 50.1 MW
- Total requested
- 50.1 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 September 2015
- Proposed online date
- December 2016
- Withdrawn
- July 2018
Location
Marker shows the centre of Yoakum County; the queue data does not give exact sites.
Other requests in Yoakum County
- Solar project GEN-2017-239, Yoakum CountySolar Β· 300 MW Β· agreement signed
- Battery storage project GEN-2019-011, Yoakum CountyBattery storage Β· 207 MW Β· agreement signed
- Solar + storage project GEN-2021-090, Yoakum CountySolar + storage Β· 400 MW Β· in study
- Solar + storage project GEN-2024-336, Yoakum CountySolar + storage Β· 300 MW Β· in study
- Battery storage project GEN-2024-SR15, Yoakum CountyBattery storage Β· 300 MW Β· in study
- Solar + storage project GEN-2024-015, Yoakum CountySolar + storage Β· 280 MW Β· in study
- Battery storage project ERAS-2025-027, Yoakum CountyBattery storage Β· 250 MW Β· in study
- Gas project GEN-2011-048, Yoakum CountyGas Β· 175 MW Β· built
- Gas project GEN-2004-015, Yoakum CountyGas Β· 150 MW Β· built
- Gas project GEN-2006-015, Yoakum CountyGas Β· 150 MW Β· built
- Gas project GEN-2012-035, Yoakum CountyGas Β· 7.0 MW Β· built
- Gas project GEN-2012-034, Yoakum CountyGas Β· 7.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem