BATTERY STORAGE Β· SOUTHEASTBattery storage project 624, Indian River County
Battery storage project 624, Indian River County is a 300 MW battery storage request withdrawn in the Southeast interconnection queue, in Indian River County, Florida, connecting to Florida Power & Light.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 624
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- FPL
- Connection point (POI)
- Southeast Indian River County
- Location
- Indian River County, Florida
- Technology
- Battery: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 8 January 2024
- Proposed online date
- January 2031
Location
Marker shows the centre of Indian River County; the queue data does not give exact sites.
Other requests in Indian River County
- Solar project 493, Indian River CountySolar Β· 74.5 MW Β· in study
- Solar project 456, Indian River CountySolar Β· 74.5 MW Β· in study
- Solar project 594, Indian River CountySolar Β· 74.5 MW Β· in study
- Solar project 492, Indian River CountySolar Β· 74.5 MW Β· in study
- Solar project 432, Indian River CountySolar Β· 74.5 MW Β· in study
- Solar project 452, Indian River CountySolar Β· 74.5 MW Β· in study
- Solar project 491, Indian River CountySolar Β· 74.5 MW Β· in study
- Solar project 427, Indian River CountySolar Β· 74.5 MW Β· in study
- Solar project 285, Indian River CountySolar Β· 74.5 MW Β· built
- Solar project 297, Indian River CountySolar Β· 74.5 MW Β· built
- Solar project 286, Indian River CountySolar Β· 74.5 MW Β· built
- Battery storage project 626, Indian River CountyBattery storage Β· 400 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem