Desert Claim

Desert Claim is a 159 MW onshore wind request withdrawn in the West interconnection queue, in Kittitas County, Washington, connecting to enXco Northwest.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2002 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G105
Grid region
West (non-ISO utilities)
Utility / transmission owner
enXco Northwest
Developer
enXco Northwest
Connection point (POI)
Covington-Columbia 230kV transmission line
Location
Kittitas County, Washington
Technology
Wind: 159 MW
Total requested
159 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
21 June 2002
Proposed online date
October 2009

Location

Marker shows the centre of Kittitas County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Kittitas County