United States βΊ Grid βΊ Interconnection queues βΊ Washington
ONSHORE WIND Β· WESTDesert Claim
Desert Claim is a 159 MW onshore wind request withdrawn in the West interconnection queue, in Kittitas County, Washington, connecting to enXco Northwest.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2002 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G105
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- enXco Northwest
- Developer
- enXco Northwest
- Connection point (POI)
- Covington-Columbia 230kV transmission line
- Location
- Kittitas County, Washington
- Technology
- Wind: 159 MW
- Total requested
- 159 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 21 June 2002
- Proposed online date
- October 2009
Location
Marker shows the centre of Kittitas County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Kittitas County
- Onshore wind project 13, Kittitas CountyOnshore wind Β· 104 MW Β· agreement signed
- Solar project 49, Kittitas CountySolar Β· 100 MW Β· agreement signed
- Onshore wind project 1 Pre Jan 2004, Kittitas CountyOnshore wind Β· 200 MW Β· in study
- Solar + storage project C1-37, Kittitas CountySolar + storage Β· 199 MW Β· suspended
- Solar project 51, Kittitas CountySolar Β· 79.2 MW Β· suspended
- Kittitas Valley WindOnshore wind Β· 108 MW Β· built
- Onshore wind project 5, Kittitas CountyOnshore wind Β· 65.0 MW Β· built
- Onshore wind project 2, Kittitas CountyOnshore wind Β· 40.0 MW Β· built
- Onshore wind project 17, Kittitas CountyOnshore wind Β· 12.0 MW Β· built
- Onshore wind project G1034, Kittitas CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project G1026, Kittitas CountyOnshore wind Β· 316 MW Β· withdrawn
- Solar + storage project 116, Kittitas CountySolar + storage Β· 300 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem