BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 153 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Worcester County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1509
Grid region
ISO-NE (New England)
Connection point (POI)
3-breaker ring bus tapping the W175 line. ESA sub located approximately 0.23 miles from West Charlton 115 kV substation at current coordinates 42° 8'10.02"N 72° 1'30.37"W
Location
Worcester County, Massachusetts
Technology
Battery: 153 MW
Total requested
153 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
3 April 2024
Proposed online date
December 2027
Withdrawn
October 2025

Location

Marker shows the centre of Worcester County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Worcester County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem