United States › Grid › Interconnection queues › New York
ONSHORE WIND · NYISOCWW 300 MW Dun
CWW 300 MW Dun is a 300 MW onshore wind request withdrawn in the NYISO interconnection queue, in Chautauqua County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedFeb 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 814
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Diamond Generating Corporation
- Connection point (POI)
- Dunkirk Substation 230kV
- Location
- Chautauqua County, New York
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Queue status
- Withdrawn
- Entered queue
- 3 April 2019
- Withdrawn
- February 2021
Location
Marker shows the centre of Chautauqua County; the queue data does not give exact sites.
Other requests in Chautauqua County
- South Ripley Solar and BESSSolar + storage · 270 MW · in study
- Lighthouse Energy StorageBattery storage · 250 MW · in study
- Basecamp BESSBattery storage · 170 MW · in study
- York Run SolarSolar · 90.0 MW · in study
- Dewdrop WindOnshore wind · 62.0 MW · in study
- Buttercup WindOnshore wind · 49.9 MW · in study
- Goldenrod WindOnshore wind · 39.0 MW · in study
- Cassadaga WindOnshore wind · 127 MW · built
- Cassadaga WindOnshore wind · 127 MW · built
- Ball Hill WindOnshore wind · 103 MW · built
- Ball Hill WindOnshore wind · 103 MW · built
- Arkwright SummitOnshore wind · 78.4 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem