United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

SOLAR Β· MISO

Solar project J2702, Fulton County

Solar project J2702, Fulton County is a 101 MW solar request withdrawn in the MISO interconnection queue, in Fulton County, Illinois, connecting to AMEREN TRANSMISSION COMPANY OF ILLINOIS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2702
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN TRANSMISSION COMPANY OF ILLINOIS
Connection point (POI)
Ipava-Macomb, West-1429 138 kV
Location
Fulton County, Illinois
Technology
Solar: 101 MW
Total requested
101 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
14 September 2022
Proposed online date
April 2027
Withdrawn
October 2025

Location

Marker shows the centre of Fulton County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Fulton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem