United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project J2323, Webster County
Onshore wind project J2323, Webster County is a 145 MW onshore wind request withdrawn in the MISO interconnection queue, in Webster County, Iowa, connecting to MIDAMERICAN ENERGY CO..
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2323
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MIDAMERICAN ENERGY CO.
- Connection point (POI)
- Webster-Lehigh 345kV
- Location
- Webster County, Iowa
- Technology
- Wind: 145 MW
- Total requested
- 145 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 13 September 2022
- Proposed online date
- October 2027
- Withdrawn
- October 2025
Location
Marker shows the centre of Webster County; the queue data does not give exact sites.
Other requests in Webster County
- Solar project J524, Webster CountySolar Β· 100 MW Β· agreement signed
- Onshore wind project J2436, Webster CountyOnshore wind Β· 300 MW Β· in study
- Onshore wind project J3926, Webster CountyOnshore wind Β· 170 MW Β· in study
- Onshore wind project R42, Webster CountyOnshore wind Β· 250 MW Β· built
- Onshore wind project J3808, Webster CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project H020, Webster CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J2435, Webster CountyOnshore wind Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem