United States βΊ Grid βΊ Interconnection queues βΊ Illinois
ONSHORE WIND Β· PJMRamble Wind
Ramble Wind is a 180 MW onshore wind request withdrawn in the PJM interconnection queue, in Logan County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedNov 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-236
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Developer
- Ramble Wind Energy LLC
- Connection point (POI)
- Lanesville-Brokaw 345 kV
- Location
- Logan County, Illinois
- Technology
- Wind: 180 MW
- Total requested
- 180 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 25 September 2020
- Proposed online date
- December 2024
- Withdrawn
- November 2025
Location
Marker shows the centre of Logan County; the queue data does not give exact sites.
Other requests in Logan County
- Solar project J1102, Logan CountySolar Β· 70.0 MW Β· under construction
- Solar project J1651, Logan CountySolar Β· 150 MW Β· in study
- Solar + storage project J3181, Logan CountySolar + storage Β· 100 MW Β· in study
- Onshore wind project AI2-167, Logan CountyOnshore wind Β· 78.0 MW Β· in study
- Solar project AI2-151, Logan CountySolar Β· 48.0 MW Β· in study
- Surplus; J1102Other Β· 40.0 MW Β· in study
- Onshore wind project J756, Logan CountyOnshore wind Β· 202 MW Β· built
- Top Hat Wind Energy CenterOnshore wind Β· 200 MW Β· built
- Hilltopper Wind FarmOnshore wind Β· 188 MW Β· built
- Hilltopper Wind, LLCOnshore wind Β· 62.5 MW Β· built
- Battery storage project J3087, Logan CountyBattery storage Β· 205 MW Β· withdrawn
- Onshore wind project J2465, Logan CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem