ONSHORE WIND · PJM

Top Hat Wind Energy Center

Top Hat Wind Energy Center is a 200 MW onshore wind request built and operating in the PJM interconnection queue, in Logan County, Illinois, connecting to ComEd.

Queue statusOperating
  1. PlanningQueued Sep 2016 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingNov 2025 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AC1-053
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Lanesville-Brokaw
Location
Logan County, Illinois
Technology
Wind: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Operational
Entered queue
1 September 2016
Proposed online date
December 2025
Came online
November 2025

Location

Marker shows the centre of Logan County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Logan County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem