United States › Grid › Interconnection queues › Illinois
SOLAR + STORAGE · MISOSolar + storage project J3181, Logan County
Solar + storage project J3181, Logan County is a 100 MW solar + storage request in interconnection study in the MISO interconnection queue, in Logan County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusIn planning
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jan 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J3181
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- 4FOGARTY - 4LIMIT 138.0kV
- Location
- Logan County, Illinois
- Technology
- Solar: 100 MW · Battery
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- January 2027
Location
Marker shows the centre of Logan County; the queue data does not give exact sites.
Other requests in Logan County
- Solar project J1102, Logan CountySolar · 70.0 MW · under construction
- Solar project J1651, Logan CountySolar · 150 MW · in study
- Onshore wind project AI2-167, Logan CountyOnshore wind · 78.0 MW · in study
- Solar project AI2-151, Logan CountySolar · 48.0 MW · in study
- Surplus; J1102Other · 40.0 MW · in study
- Onshore wind project J756, Logan CountyOnshore wind · 202 MW · built
- Top Hat Wind Energy CenterOnshore wind · 200 MW · built
- Hilltopper Wind FarmOnshore wind · 188 MW · built
- Hilltopper Wind, LLCOnshore wind · 62.5 MW · built
- Battery storage project J3087, Logan CountyBattery storage · 205 MW · withdrawn
- Onshore wind project J2465, Logan CountyOnshore wind · 200 MW · withdrawn
- Solar project J1650, Logan CountySolar · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem