Geothermal interconnection queue in the USA (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6209 MW
Active in queue209 MW6 requests
Agreement signed159 MW5 requests
Withdrawn00.0 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Geothermal project GI-2020-130, Imperial County
Geothermal
50.0 MWIn study Imperial, CAWest Jan 2020target 2028
Geothermal project Company KJ, Washoe County
Geothermal
38.5 MWAgreement signed Washoe, NVWest Feb 2020target 2023
Geothermal project Company KI, Washoe County
Geothermal
38.5 MWAgreement signed Washoe, NVWest Feb 2020target 2025
Geothermal project Company KH, Esmeralda County
Geothermal
38.5 MWAgreement signed Esmeralda, NVWest Feb 2020target 2022
Geothermal project Company KG, Eureka County
Geothermal
38.5 MWAgreement signed Eureka, NVWest Feb 2020target 2027
Geothermal project Company KO, Lyon County
Geothermal
4.8 MWAgreement signed Lyon, NVWest Sep 2020target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)