Gas queue projects under construction in the USA

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown62,871 MW
Active in queue263.4 GW688 requests
Agreement signed39.9 GW131 requests
Withdrawn2,231897.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J955, Sangamon County
Gas
1,165 MWUnder construction Sangamon, ILMISO Mar 2018target 2025
Gas project 137, Pasco County
Gas Β· Seminole Electric Cooperative, Inc.
575 MWUnder construction Pasco, FLSoutheast Nov 2015target 2020
Gas project J732, Douglas County
Gas
562 MWUnder construction Douglas, WIMISO Jun 2017target 2023
Gas project 899771, Person County
Gas Β· Duke Energy Progress, LLC
313 MWUnder construction Person, NCSoutheast Jun 2023
Gas project 328, Pinellas County
Gas Β· Duke Energy Florida, LLC
172 MWUnder construction Pinellas, FLSoutheast Jun 2023target 2024
Gas project 333, Polk County
Gas Β· Duke Energy Florida, LLC
84.0 MWUnder construction Polk, FLSoutheast Jul 2023target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)