United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
OCTARY USA Β· INTERCONNECTION QUEUESOther interconnection queue in Wisconsin
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Replacing 303.5 MW BESS with 303.5 MW COAL; Edgewater Unit 5 Other |
304 MW | In study |
| Surplus; J1314 Other |
100 MW | In study |
| Surplus; J1002 Other |
50.0 MW | In study |
| Surplus; J1304 Other |
33.0 MW | In study |
| Surplus; J1188 Other |
25.0 MW | In study |
| Surplus; J1000 Other |
25.0 MW | In study |
| Surplus; J1305 Other |
25.0 MW | In study |
| Replacing 20 MW of solar with storage; J1746 Other |
20.2 MW | In study |
| Other project G085, Jackson County Other |
7.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)