Withdrawn queue requests in Wisconsin (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown63,913 MW
Active in queue21.0 MW1 requests
Agreement signed21.0 MW1 requests
Withdrawn63,913 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J336, Calumet County
Gas
845 MWWithdrawn / abandoned Calumet, WIMISO May 2014
Gas project J338, Winnebago County
Gas
845 MWWithdrawn / abandoned Winnebago, WIMISO May 2014
Gas project J383, Manitowoc County
Gas
571 MWWithdrawn / abandoned Manitowoc, WIMISO Aug 2014target 2019
Gas project J337, Winnebago County
Gas
551 MWWithdrawn / abandoned Winnebago, WIMISO May 2014
Gas project J335, Calumet County
Gas
551 MWWithdrawn / abandoned Calumet, WIMISO May 2014
Gas project J389, Rock County
Gas
550 MWWithdrawn / abandoned Rock, WIMISO Sep 2014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)