United States β€Ί Grid β€Ί Interconnection queues β€Ί Virginia

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Virginia (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown112,323 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn112,323 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

11 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project X2-082, Chesterfield County
Gas
1,575 MWWithdrawn / abandoned Chesterfield, VAPJM Jul 2011target 2015
Gas project X3-076, Fauquier County
Gas
510 MWWithdrawn / abandoned Fauquier, VAPJM Oct 2011target 2015
Gas project X1-080, Prince George County
Gas
135 MWWithdrawn / abandoned Prince George, VAPJM Apr 2011target 2015
Battery storage project X4-014, Northampton County
Battery storage
20.0 MWWithdrawn / abandoned Northampton, VAPJM Nov 2011target 2013
Gas project X1-053, City Of Suffolk County
Gas
20.0 MWWithdrawn / abandoned City Of Suffolk, VAPJM Mar 2011target 2011
Gas project X3-032, Prince George County
Gas
20.0 MWWithdrawn / abandoned Prince George, VAPJM Aug 2011target 2015
Onshore wind project X3-040, Northampton County
Onshore wind
18.0 MWWithdrawn / abandoned Northampton, VAPJM Aug 2011target 2016
Other project X3-055, Fairfax County
Other
10.0 MWWithdrawn / abandoned Fairfax, VAPJM Sep 2011target 2013
Other project X2-040, Pulaski County
Other
6.0 MWWithdrawn / abandoned Pulaski, VAPJM Jun 2011target 2012
Offshore wind project X3-047, Northampton County
Offshore wind
5.0 MWWithdrawn / abandoned Northampton, VAPJM Sep 2011target 2012
Other project X2-061, Brunswick County
Other
4.0 MWWithdrawn / abandoned Brunswick, VAPJM Jun 2011target 2012

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)