Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5509 MW
Active in queue2,116 MW17 requests
Agreement signed1,607 MW12 requests
Withdrawn7911.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Maroon Solar
Solar
149 MWPaused / redesign Culpeper, VAPJM Sep 2018target 2027
CC Solar I
Solar
120 MWPaused / redesign Caroline, VAPJM Sep 2018target 2025
Blue Jay Solar
Solar
100 MWPaused / redesign Pulaski, VAPJM Mar 2018target 2025
Bakers Pond Solar
Solar
100 MWPaused / redesign Prince George, VAPJM Sep 2018target 2026
Ho-Fel Solar
Solar
40.0 MWPaused / redesign Isle Of Wight, VAPJM Sep 2018target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)