Completed queue projects in Virginia (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9930 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn82,565 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Stonewall Energy Park
Gas
800 MWOperating Loudoun, VAPJM Jan 20122017
SPSA Navy Power Plant
Other
40.0 MWOperating City Of Portsmouth, VAPJM May 20122014
Hopewell Cogeneration Facility (HCF)
Gas
30.0 MWOperating City Of Hopewell, VAPJM Oct 20122017
MeadWestvaco Covington Mill Site
Other
20.0 MWOperating VAPJM Apr 20122013
Clover Power Station Unit 1
Coal
13.7 MWOperating Halifax, VAPJM Oct 20122014
Virginia City Hybrid Energy Center
Coal
12.0 MWOperating Wise, VAPJM Sep 20122014
Hopewell Cogeneration Facility (HCF)
Gas
8.0 MWOperating City Of Hopewell, VAPJM Oct 20122013
New River Resource Authority Waste Management Facility IRD LEG-E
Other
6.0 MWOperating Pulaski, VAPJM Apr 20122014
Bayview
Other
0.5 MWOperating Northampton, VAPJM Nov 20122013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)