United States βΊ Grid βΊ Interconnection queues βΊ Virginia
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in Virginia (2012 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Stonewall Energy Park Gas |
800 MW | |
| SPSA Navy Power Plant Other |
40.0 MW | |
| Hopewell Cogeneration Facility (HCF) Gas |
30.0 MW | |
| MeadWestvaco Covington Mill Site Other |
20.0 MW | |
| Clover Power Station Unit 1 Coal |
13.7 MW | |
| Virginia City Hybrid Energy Center Coal |
12.0 MW | |
| Hopewell Cogeneration Facility (HCF) Gas |
8.0 MW | |
| New River Resource Authority Waste Management Facility IRD LEG-E Other |
6.0 MW | |
| Bayview Other |
0.5 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)