United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Utah (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3420 MW
Active in queue420 MW3 requests
Agreement signed75.0 MW1 requests
Withdrawn385,142 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project TCS-09, Utah County
Solar + storage Β· Longroad Development Company, LLC
300 MWPaused / redesign Utah, UTWest Nov 2017target 2023
Solar project 846, Tooele County
Solar Β· Horseshoe Solar, LLC
75.0 MWAgreement signed Tooele, UTWest Jan 2017target 2023
Solar + storage project 862, Box Elder County
Solar + storage Β· Rocket Solar, LLC
45.0 MWPaused / redesign Box Elder, UTWest Apr 2017target 2019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)