United States โ€บ Grid โ€บ Interconnection queues โ€บ Utah

OCTARY USA ยท INTERCONNECTION QUEUES

Withdrawn queue requests in Utah (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown51960 MW
Active in queue450 MW1 requests
Agreement signed0.0 MW0 requests
Withdrawn51960 MW never built

Map

Loading requestsโ€ฆ
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

51 requests ยท page 1 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project 460, Millard County
Onshore wind
160 MWWithdrawn / abandoned Millard, UTWest Jan 2013
Solar project 541, San Juan County
Solar
80.0 MWWithdrawn / abandoned San Juan, UTWest Dec 2013target 2015
Onshore wind project 474, Washington County
Onshore wind
80.0 MWWithdrawn / abandoned Washington, UTWest Mar 2013target 2014
Onshore wind project 470, Tooele County
Onshore wind
78.2 MWWithdrawn / abandoned Tooele, UTWest Feb 2013target 2014
Onshore wind project 540, San Juan County
Onshore wind
70.0 MWWithdrawn / abandoned San Juan, UTWest Dec 2013target 2015
Solar project 461, Iron County
Solar
51.0 MWWithdrawn / abandoned Iron, UTWest Jan 2013target 2014
Solar project 505, Iron County
Solar
50.4 MWWithdrawn / abandoned Iron, UTWest Jul 2013target 2015
Solar project 507, Iron County
Solar
50.4 MWWithdrawn / abandoned Iron, UTWest Aug 2013target 2015
Solar project 465, San Juan County
Solar
50.4 MWWithdrawn / abandoned San Juan, UTWest Feb 2013target 2015
Gas project 508, Utah County
Gas ยท Jordan Cove Energy Project, L.P.
45.0 MWWithdrawn / abandoned Utah, UTWest Aug 2013target 2014
Solar project 525, Iron County
Solar
40.0 MWWithdrawn / abandoned Iron, UTWest Oct 2013target 2016
Solar project 468, Duchesne County
Solar
40.0 MWWithdrawn / abandoned Duchesne, UTWest Feb 2013target 2015
Solar project 466, Iron County
Solar
25.6 MWWithdrawn / abandoned Iron, UTWest Feb 2013target 2014
Solar project 467, Utah County
Solar
25.6 MWWithdrawn / abandoned Utah, UTWest Feb 2013target 2015
Other project 524, Salt Lake County
Other
6.0 MWWithdrawn / abandoned Salt Lake, UTWest Oct 2013target 2015
Other project 523, Utah County
Other
6.0 MWWithdrawn / abandoned Utah, UTWest Oct 2013target 2015
Solar project 520, Washington County
Solar
3.0 MWWithdrawn / abandoned Washington, UTWest Oct 2013target 2015
Solar project 479, Iron County
Solar
3.0 MWWithdrawn / abandoned Iron, UTWest Mar 2013target 2014
Solar project 463, Iron County
Solar
3.0 MWWithdrawn / abandoned Iron, UTWest Feb 2013target 2016
Solar project 481, Beaver County
Solar
3.0 MWWithdrawn / abandoned Beaver, UTWest Mar 2013target 2014
Solar project 485, Beaver County
Solar
3.0 MWWithdrawn / abandoned Beaver, UTWest Mar 2013target 2014
Solar project 484, Beaver County
Solar
3.0 MWWithdrawn / abandoned Beaver, UTWest Mar 2013target 2014
Solar project 527, Emery County
Solar
3.0 MWWithdrawn / abandoned Emery, UTWest Oct 2013target 2014
Solar project 536, Millard County
Solar ยท PacifiCorp Energy
3.0 MWWithdrawn / abandoned Millard, UTWest Nov 2013target 2014
Solar project 530, Iron County
Solar
3.0 MWWithdrawn / abandoned Iron, UTWest Oct 2013target 2015
Solar project 480, Iron County
Solar
3.0 MWWithdrawn / abandoned Iron, UTWest Mar 2013target 2014
Solar project 482, Beaver County
Solar
3.0 MWWithdrawn / abandoned Beaver, UTWest Mar 2013target 2014
Solar project 529, Iron County
Solar
3.0 MWWithdrawn / abandoned Iron, UTWest Oct 2013target 2015
Solar project 483, Beaver County
Solar
3.0 MWWithdrawn / abandoned Beaver, UTWest Mar 2013target 2014
Solar project 452, Iron County
Solar
3.0 MWWithdrawn / abandoned Iron, UTWest Jan 2013target 2013
Solar project 490, Beaver County
Solar ยท EDF Renewable Development, Inc.
3.0 MWWithdrawn / abandoned Beaver, UTWest Mar 2013target 2013
Solar project 528, Emery County
Solar
3.0 MWWithdrawn / abandoned Emery, UTWest Oct 2013target 2014
Solar project 537, Millard County
Solar
3.0 MWWithdrawn / abandoned Millard, UTWest Nov 2013target 2014
Solar project 531, Iron County
Solar
3.0 MWWithdrawn / abandoned Iron, UTWest Oct 2013target 2015
Solar project 478, Iron County
Solar
3.0 MWWithdrawn / abandoned Iron, UTWest Mar 2013target 2014
Solar project 518, Washington County
Solar
3.0 MWWithdrawn / abandoned Washington, UTWest Oct 2013target 2015
Solar project 486, Beaver County
Solar
3.0 MWWithdrawn / abandoned Beaver, UTWest Mar 2013target 2014
Solar project 535, Millard County
Solar
3.0 MWWithdrawn / abandoned Millard, UTWest Nov 2013target 2014
Solar project 476, Beaver County
Solar
3.0 MWWithdrawn / abandoned Beaver, UTWest Mar 2013target 2014
Solar project 477, Iron County
Solar
3.0 MWWithdrawn / abandoned Iron, UTWest Mar 2013target 2014
Solar project 526, Emery County
Solar
3.0 MWWithdrawn / abandoned Emery, UTWest Oct 2013target 2014
Solar project 487, Iron County
Solar
3.0 MWWithdrawn / abandoned Iron, UTWest Mar 2013target 2014
Solar project 504, Beaver County
Solar
2.9 MWWithdrawn / abandoned Beaver, UTWest Jun 2013target 2015
Solar project 521, Washington County
Solar
2.9 MWWithdrawn / abandoned Washington, UTWest Oct 2013target 2015
Solar project 451, Iron County
Solar
2.9 MWWithdrawn / abandoned Iron, UTWest Jan 2013target 2016
Solar project 503, Beaver County
Solar
2.9 MWWithdrawn / abandoned Beaver, UTWest Jun 2013target 2013
Solar project 519, Washington County
Solar
2.9 MWWithdrawn / abandoned Washington, UTWest Oct 2013target 2015
Other project 500, Utah County
Other
2.6 MWWithdrawn / abandoned Utah, UTWest Jun 2013target 2013
Solar project 457, Beaver County
Solar ยท Long Ridge Wind, LLP
2.1 MWWithdrawn / abandoned Beaver, UTWest Jan 2013target 2015
Solar project 456, Beaver County
Solar
2.1 MWWithdrawn / abandoned Beaver, UTWest Jan 2013target 2016
Page 1 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)