Solar project 468, Duchesne County is a 40.0 MW solar request withdrawn in the West interconnection queue, in Duchesne County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2013 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 468
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Upalco substation
- Location
- Duchesne County, Utah
- Technology
- Solar: 40.0 MW
- Total requested
- 40.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- WITHDRAWN BY CUSTOMER
- Queue status
- Withdrawn
- Entered queue
- 11 February 2013
- Proposed online date
- November 2015
Location
Marker shows the centre of Duchesne County; the queue data does not give exact sites.
Other requests in Duchesne County
- Battery storage project C4-024, Duchesne CountyBattery storage Β· 150 MW Β· withdrawn
- Solar + storage project C3-059, Duchesne CountySolar + storage Β· 100 MW Β· withdrawn
- Solar + storage project C4-084, Duchesne CountySolar + storage Β· 100 MW Β· withdrawn
- Solar + storage project C3-176, Duchesne CountySolar + storage Β· 100 MW Β· withdrawn
- Solar project C3-117, Duchesne CountySolar Β· 100 MW Β· withdrawn
- Solar + storage project C3-118, Duchesne CountySolar + storage Β· 5.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem