United States βΊ Grid βΊ Interconnection queues βΊ Utah
BATTERY STORAGE Β· WESTBattery storage project C4-024, Duchesne County
Battery storage project C4-024, Duchesne County is a 150 MW battery storage request withdrawn in the West interconnection queue, in Duchesne County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C4-024
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Carbon - Ashley Valley tranmission line
- Location
- Duchesne County, Utah
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 10 May 2024
- Proposed online date
- January 2029
Location
Marker shows the centre of Duchesne County; the queue data does not give exact sites.
Other requests in Duchesne County
- Solar + storage project C3-059, Duchesne CountySolar + storage Β· 100 MW Β· withdrawn
- Solar + storage project C4-084, Duchesne CountySolar + storage Β· 100 MW Β· withdrawn
- Solar + storage project C3-176, Duchesne CountySolar + storage Β· 100 MW Β· withdrawn
- Solar project C3-117, Duchesne CountySolar Β· 100 MW Β· withdrawn
- Solar project 468, Duchesne CountySolar Β· 40.0 MW Β· withdrawn
- Solar + storage project C3-118, Duchesne CountySolar + storage Β· 5.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem