United States βΊ Grid βΊ Interconnection queues βΊ Utah
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Utah (2011 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project 403, Sevier County Gas |
525 MW | Withdrawn / abandoned |
| Gas project 377, Salt Lake County Gas |
275 MW | Withdrawn / abandoned |
| Solar project 369, Iron County Solar |
100 MW | Withdrawn / abandoned |
| Onshore wind project 400, San Juan County Onshore wind Β· PacifiCorp Energy |
80.0 MW | Withdrawn / abandoned |
| Onshore wind project 397, Washington County Onshore wind |
16.0 MW | Withdrawn / abandoned |
| Other project 404, Sanpete County Other |
11.8 MW | Withdrawn / abandoned |
| Solar project 388, Iron County Solar |
3.0 MW | Withdrawn / abandoned |
| Onshore wind project 405, Tooele County Onshore wind Β· Tasco Energy, LLC |
1.6 MW | Withdrawn / abandoned |
| Other project 390, Beaver County Other |
0.4 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)