United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

OCTARY USA Β· INTERCONNECTION QUEUES

Projects with signed interconnection agreements in Utah (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown81,463 MW
Active in queue4,313 MW14 requests
Agreement signed1,463 MW8 requests
Withdrawn324,651 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project 838, Utah County
Solar + storage Β· Faraday Interconnection LLC
525 MWAgreement signed Utah, UTWest Dec 2016target 2025
Solar + storage project 787, Emery County
Solar + storage Β· Green River Solar I, LLC
400 MWAgreement signed Emery, UTWest Aug 2016target 2024
Solar project 823, Emery County
Solar Β· PacifiCorp Energy Supply Management
178 MWAgreement signed Emery, UTWest Nov 2016target 2027
Onshore wind project 786, Summit County
Onshore wind Β· Echo Divide Wind, LLC
100 MWAgreement signed Summit, UTWest Aug 2016target 2027
Solar + storage project 754, Box Elder County
Solar + storage Β· Steel Solar, LLC
80.0 MWAgreement signed Box Elder, UTWest May 2016target 2023
Solar project 781, Tooele County
Solar Β· Elektron Solar, LLC
80.0 MWAgreement signed Tooele, UTWest Aug 2016target 2023
Solar + storage project 792, Carbon County
Solar + storage Β· RC Solar Energy LLC
80.0 MWAgreement signed Carbon, UTWest Sep 2016target 2025
Solar project 815, Emery County
Solar Β· Pivot 13, LLC
20.0 MWAgreement signed Emery, UTWest Nov 2016target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)