United States βΊ Grid βΊ Interconnection queues βΊ Texas
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Texas (2012 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project GEN-2012-014, Gray County Gas |
425 MW | Withdrawn / abandoned |
| Panhandle Wind 3 Onshore wind Β· PATTERN PANHANDLE WIND 3 LLC |
248 MW | Withdrawn / abandoned |
| Gas project GEN-2012-038, Floyd County Gas |
203 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2013-001, Sherman County Onshore wind |
200 MW | Withdrawn / abandoned |
| Gas project GEN-2012-008, Yoakum County Gas |
40.0 MW | Withdrawn / abandoned |
| Gas project GEN-2012-009, Yoakum County Gas |
15.0 MW | Withdrawn / abandoned |
| Gas project GEN-2012-010, Yoakum County Gas |
15.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)