United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Texas (2024 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown549.8 MW
Active in queue109.5 GW452 requests
Agreement signed17.3 GW74 requests
Withdrawn429,552 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Prairie Creek BESS
Battery storage Β· SMT Dallas LLC
10.0 MWOperating Dallas, TXERCOT Jan 20242025
Crockett BESS1
Other Β· ESTX-PLD-HOUSTON1, LLC
10.0 MWOperating Harris, TXERCOT Mar 20242024
Mayberry II BESS
Battery storage Β· SMT Mission II LLC
10.0 MWOperating Hidalgo, TXERCOT Jan 20242025
Tynan BESS1
Battery storage Β· HEN INFRASTRUCTURE, LLC 1
9.9 MWOperating Bee, TXERCOT May 20242025
Liggett Switch BESS
Other Β· ESTX-PLD-ARLINGTON1, LLC
9.9 MWOperating Dallas, TXERCOT Mar 20242024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)