United States βΊ Grid βΊ Interconnection queues βΊ Texas
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in Texas (2013 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Torrecillas Wind Onshore wind Β· Nextera |
301 MW | |
| Cabezon Wind Onshore wind Β· Longroad Energy |
238 MW | |
| Gas project GEN-2013-016, Hale County Gas |
203 MW | |
| Corazon Solar Solar Β· Corazon Energy, LLC |
203 MW | |
| El Algodon Alto W Onshore wind Β· RWE Renewables Development, LLC |
201 MW | |
| Stella 1 Wind Onshore wind Β· Eon |
201 MW | |
| Onshore wind project GEN-2013-027, Bailey County Onshore wind |
148 MW | |
| Emerald Grove Solar Solar Β· Emerald Grove Solar, LLC |
108 MW | |
| West of Pecos Solar Solar Β· Eon |
100 MW | |
| BlueBell Solar Solar Β· Nextera |
30.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)