Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown61,300 MW
Active in queue1,355 MW10 requests
Agreement signed0.0 MW0 requests
Withdrawn61,300 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project J3279, Day County
Onshore wind
300 MWWithdrawn / abandoned Day, SDMISO Apr 2024target 2028
Battery storage project J3824, Roberts County
Battery storage
250 MWWithdrawn / abandoned Roberts, SDMISO Apr 2024target 2028
Solar project J3862, Deuel County
Solar
250 MWWithdrawn / abandoned Deuel, SDMISO Dec 2024target 2028
Onshore wind project GEN-2024-059, Stanley County
Onshore wind
200 MWWithdrawn / abandoned Stanley, SDSPP Oct 2024target 2028
Battery storage project J3265, Brookings County
Battery storage
175 MWWithdrawn / abandoned Brookings, SDMISO Apr 2024target 2028
Gas project BHBE G26, Pennington County
Gas Β· Black Hills Power Inc.
125 MWWithdrawn / abandoned Pennington, SDWest Jun 2024target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)