United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Pennsylvania (2024 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Shallow Seam BESS Battery storage Β· Shallow Seam Energy Storage, LLC |
400 MW | In study |
| Stargazer II Solar + storage Β· RWE Solar Development, LLC |
325 MW | In study |
| Stargazer I Solar + storage Β· RWE Solar Development, LLC |
325 MW | In study |
| Moonlight Flats Solar Solar Β· Moonlight Flats Solar Power, LLC |
250 MW | In study |
| Kimberlite Solar Solar Β· Kimberlite Solar Power, LLC |
175 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)