Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5437 MW
Active in queue437 MW5 requests
Agreement signed110 MW1 requests
Withdrawn15012.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Rogue's Wind
Onshore wind
110 MWAgreement signed Clearfield, PAPJM Aug 2019target 2026
Onshore wind project AH2-247, Cambria County
Onshore wind
83.3 MWIn study Cambria, PAPJM Mar 2022target 2028
Onshore wind project AH2-248, Cambria County
Onshore wind
83.3 MWIn study Cambria, PAPJM Mar 2022target 2028
Onshore wind project AH2-403, Cambria County
Onshore wind
83.3 MWIn study Cambria, PAPJM Mar 2022target 2028
Onshore wind project AH2-292, Cambria County
Onshore wind
77.0 MWIn study Cambria, PAPJM Mar 2022target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)