United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Pennsylvania (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown91,517 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn304,984 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Lackawanna Thermal Generating Station
Gas
1,000 MWOperating Lackawanna, PAPJM Jan 20122018
Lackawanna Thermal Generating Station
Gas
370 MWOperating Lackawanna, PAPJM Oct 20122018
Liberty Electric
Gas
65.5 MWOperating Delaware, PAPJM Sep 20122015
Onshore wind project Y1-033, Somerset County
Onshore wind
38.3 MWOperating Somerset, PAPJM Feb 20122016
Oxbow Creek Generation Plant
Gas
18.3 MWOperating Wyoming, PAPJM Jul 20122019
Roundtop Energy Project
Gas
15.4 MWOperating Wyoming, PAPJM Mar 20122015
Bethlehem Landfill
Other
5.0 MWOperating Northampton, PAPJM Oct 20122016
Roundtop Energy Project
Gas
3.5 MWOperating Susquehanna, PAPJM Aug 20122015
Barbadoes Energy Storage Unit
Battery storage
1.0 MWOperating Montgomery, PAPJM Apr 20122013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)