Interconnection queue in Ohio (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5410 MW
Active in queue410 MW5 requests
Agreement signed410 MW5 requests
Withdrawn305,717 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Vinton Solar
Solar
125 MWAgreement signed Vinton, OHPJM Oct 2016target 2027
Sycamore Creek Solar
Solar
117 MWAgreement signed Crawford, OHPJM Dec 2016target 2025
Dixon Solar
Solar
70.0 MWAgreement signed Jackson, OHPJM Nov 2016target 2028
Mark Center Solar Project
Solar
49.9 MWAgreement signed Defiance, OHPJM Nov 2016target 2026
Great Bend
Solar
48.0 MWAgreement signed Meigs, OHPJM Oct 2016target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)