United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Ohio (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown8596 MW
Active in queue3,339 MW34 requests
Agreement signed2,742 MW26 requests
Withdrawn404,295 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Kensington Solar
Solar
145 MWPaused / redesign Columbiana, OHPJM Mar 2019target 2026
Clermont County Solar Project
Solar
100 MWPaused / redesign Clermont, OHPJM Mar 2019target 2025
Nottingham Solar
Solar
100 MWPaused / redesign Harrison, OHPJM Mar 20192023
Morrow County Solar II
Solar
64.0 MWPaused / redesign Morrow, OHPJM Sep 2019target 2026
Hardin Energy Center β€šΓ„Γ¬ Storage II
Battery storage
55.0 MWPaused / redesign Hardin, OHPJM Mar 2019target 2026
Clermont County Solar Project
Battery storage
52.2 MWPaused / redesign Clermont, OHPJM Jun 2019target 2025
Woodstock Solar
Solar
40.0 MWPaused / redesign Champaign, OHPJM Mar 2019target 2026
Henry County Solar
Solar
40.0 MWPaused / redesign Henry, OHPJM Sep 2019target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)