Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| South Field Energy Power Plant Gas |
1,152 MW | |
| Lordstown Energy Center Gas |
800 MW | |
| Oregon Energy Center Gas |
161 MW | |
| Gas project Z2-112, Washington County Gas |
97.0 MW | |
| Stuart Electric Generating Station Coal |
20.5 MW | |
| Cornu Gas |
10.0 MW | |
| Washington Energy Facility Gas |
5.0 MW | |
| Clinton County Energy Storage Project Battery storage |
4.0 MW | |
| Erie County Landfill Other |
0.8 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)