United States βΊ Grid βΊ Interconnection queues βΊ New York
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in New York (2017 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Alle Catt II Wind Onshore wind Β· Alle-Catt Wind Energy LLC |
339 MW | In study |
| Gateway Solar Energy Center Solar Β· Gateway Solar Energy Center, LLC |
180 MW | In study |
| Flint Mine Solar Solar Β· Flint Mine Solar LLC |
100 MW | In study |
| Columbia County 1 Solar Β· Hecate Energy Columbia County 1, LLC |
60.0 MW | In study |
| Watkins Glen Solar Solar Β· Watkins Glen Solar Energy Center, LLC |
50.0 MW | In study |
| SunEast Skyline Solar LLC Solar Β· SunEast Skyline Solar LLC |
20.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)