United States β€Ί Grid β€Ί Interconnection queues β€Ί New Jersey

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in New Jersey (2019 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown632.5 MW
Active in queue600 MW9 requests
Agreement signed600 MW9 requests
Withdrawn845,354 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Viridity Energy Solutions Montague Storage
Battery storage
20.0 MWOperating Sussex, NJPJM Apr 20192024
Sayreville Facility (Raritan River)
Gas
5.5 MWOperating Middlesex, NJPJM Sep 20192020
Pear Street Solar
Solar
2.4 MWOperating Atlantic, NJPJM Jun 20192020
Kinsley 2 Beaverbrook Solar
Solar
2.0 MWOperating Gloucester, NJPJM Feb 20192023
Kinsley 2 Deptford Solar
Solar
1.8 MWOperating Gloucester, NJPJM Feb 20192020
Pilesgrove Solar
Solar
0.8 MWOperating Salem, NJPJM Mar 20192019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)