Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown153,480 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn153,480 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

15 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Sandy Valley Phase II Segs
Gas
540 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Enn Mojave Power 4
Other
300 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Solar project Q29, Clark County
Solar
300 MWWithdrawn / abandoned Clark, NVWest Jun 2012target 2014
Enn Mojave Power 3
Other
300 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Boulder Solar Power
Solar
300 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Sandy Valley Solar Project
Solar
250 MWWithdrawn / abandoned Nye, NVCAISO Apr 2012target 2018
Enn Mojave Power 1
Other
250 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Enn Mojave Power 2
Other
250 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Pahrump Valley Solar (Fka Lathrop Wells 240MW)
Solar
210 MWWithdrawn / abandoned Nye, NVCAISO Apr 2012target 2019
Solar + storage project Q37, Clark County
Solar + storage
200 MWWithdrawn / abandoned Clark, NVWest Nov 2012target 2015
Solar project Q33, Clark County
Solar
180 MWWithdrawn / abandoned Clark, NVWest Sep 2012target 2014
Copper Rays Solar
Solar
180 MWWithdrawn / abandoned Nye, NVCAISO Apr 2012target 2013
Townsite Solar Project
Solar
180 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Vea Blackrock
Solar
20.0 MWWithdrawn / abandoned Nye, NVCAISO Apr 2012target 2016
Vea Homestead
Solar
20.0 MWWithdrawn / abandoned Nye, NVCAISO Apr 2012target 2014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)